Rail Trail

View the original feasibility study from 2007 and detailed maps of the proposed trail.

Public Hearing March 19, 2019
A public hearing will take place on March 19, 2019 at the Lynnfield Middle School. The event will be hosted by Mass DOT and will begin at 6:30 p.m.

View the official notice from MASS DOT here.

The proposed trail consists of a 10 to 12-foot-wide asphalt surface for about 2/3 of its alignment and elevated boardwalk through the Reedy Meadow and low areas within the floodplain. The project also includes paved parking areas, safety improvements at roadway crossings, new signs and pavement markings and landscape enhancements.