Building Division

Americal Civic Center Column Project

The existing columns at the Civic Center were chipping and cracking due to outdoor elements and old age.  In May of 2017, the columns were repaired and a coated copper cap was added to the columns.

             BEFORE                             AFTER

    

 

Senior Center Roof Replacement (Phase 1)

 

The existing kiosks along Lake Quannapowitt were in disrepair and the DPW Building Division led an improvement project to upgrade them to a standard the town can be proud of...

 

Division Overview
The DPW Building Department is responsible for ensuring that all Town-Owned Buildings are maintained to the highest standards possible.

 

 

 

 